Sewerage and wastewater treatment

Sewerage systems

External sewerage connects the building outlet to a biological treatment unit, holding tank or public sewer. Reliable operation depends on correct pipe gradients and depth, inspection chamber placement and a suitable discharge arrangement.

Request a proposal
Company project photo: external sewerage connects the building outlet to a biological treatment unit, holding tank or public sewerCompany project photo: external sewerage connects the building outlet to a biological treatment unit, holding tank or public sewer
Who it suits

Who it suits

  • External drainage for homes and commercial properties
  • Connections to a biological unit or public sewer
  • New construction and system replacement
Problems it solves

Problems it solves

  • Set out the route, gradient and installation depth
  • Install pipes, inspection chambers and connections
  • Test wastewater flow and prepare the system for use
How the work proceeds

How the work proceeds

  1. 01

    Survey of the building outlet and connection point

    We establish the location, objective and available documents.

  2. 02

    Agreement of route, levels and materials

    We assess ground conditions, equipment access and the proposed system.

  3. 03

    Excavation, bedding preparation and pipe installation

    We define scope, sequence and the factors that shape cost.

  4. 04

    Testing, backfilling and reinstatement

    We carry out the agreed work and test the system.

What shapes the cost

  • Pipe length, depth and diameter
  • Ground conditions, levels and groundwater
  • Inspection chambers, connections and pumping requirements
  • Equipment access and reinstatement scope

A proposal follows a review of site data. Send the address and a short brief on WhatsApp.

What we need from you

  • Site plan with building and connection point
  • Building outlet depth and diameter
  • Treatment-unit, holding-tank or public-sewer information

Send the location and a short brief. We will respond with the information needed for the next step.

Project work

Project work

Company project photo: external sewerage connects the building outlet to a biological treatment unit, holding tank or public sewerCompany project photo: external sewerage connects the building outlet to a biological treatment unit, holding tank or public sewer
Close view of the installed equipment or completed resultClose view of the installed equipment or completed result
FAQ

Frequently asked questions

Quick contact

Your project can start with one message

There is no long form to complete. Send the essentials on WhatsApp and we will help identify a sound next step.

WhatsApp