Who it suits
- New buildings where heating and the ground loop can be coordinated early
- Buildings with a calculated heat load and suitable low-temperature heating
- Properties with space for a vertical ground-loop arrangement
A geothermal system uses heat stored in the ground. We design the vertical ground loop, heat pump and building heating system as one integrated solution.
Request a proposal
We establish the location, objective and available documents.
We assess ground conditions, equipment access and the proposed system.
We define scope, sequence and the factors that shape cost.
We carry out the agreed work and test the system.
A proposal follows a review of site data. Send the address and a short brief on WhatsApp.
Send the location and a short brief. We will respond with the information needed for the next step.


No. The heat load, building performance, heating temperatures and hot-water demand are also needed.
Yes. Their operating parameters affect each other, so both need to be coordinated within the system calculation.
There is no long form to complete. Send the essentials on WhatsApp and we will help identify a sound next step.